China Wholesale Dust Collection Fittings Manufacturer – Performance FMIC Front Mount Intercooler Kit Fit For Subaru Impreza WRX Gc8 1996-2000 – Yibai
China Wholesale Dust Collection Fittings Manufacturer – Performance FMIC Front Mount Intercooler Kit Fit For Subaru Impreza WRX Gc8 1996-2000 – Yibai Detail:
* Product Description
Application:
For Subaru Impreza GC8 WRX/STI w/EJ20T;JDM WRX 2.0L Turbo/STi EJ207 1996-2000 RS
1.100% Brand New, Never U sed or Installed
2.Intercooler pipe:Made of high quality T6061 aluminum
3.T-bolt clamp:Made of High quality stainless steel
4.silicone hose:Made of high quality silicone
After market product
Intercooler:
max. recommended psi: 32psi
PSi Drop under 0.2. Other Intercooler usually drop 10 Psi Some are More.
Max PSi is 30 Up to 400HP
Instruction is not included.
Professional installation is highly recommended
* Packing
Intercooler Kit Include :
3pcs alloy pipe (63mm)
1pcs alloy pipe (51-63mm)
6pcs silicone hoses (1pcs 51mm / 2pcs 63mm / 1pcs 63-70mm / 2pcs 63-76mm)
12pcs T-clamps
And small fititngs as on the picture.
Pipe Thickness: 1.8 mm
Wholesale factory Front Mount Intercooler Kit
Oem Chinese Front Mount Intercooler Kit
auto parts factory Front Mount Intercooler Kit
* Detail
Product detail pictures:
Related Product Guide:
We emphasize enhancement and introduce new solutions into the market just about every year for China Wholesale Dust Collection Fittings Manufacturer – Performance FMIC Front Mount Intercooler Kit Fit For Subaru Impreza WRX Gc8 1996-2000 – Yibai , The product will supply to all over the world, such as: South Korea, Macedonia, Uruguay, Our products have won an excellent reputation at each of the related nations. Because the establishment of our firm. we've insisted on our production procedure innovation together with the most recent modern day managing method, attracting a sizable quantity of talents within this industry. We regard the solution good quality as our most vital essence character.
Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,





